Recovering Performance Across the Diesel Production Chain

Increasing diesel production depends on the capacity and condition of several interconnected refinery systems. Hydrogen availability supports hydrotreating and hydrocracking, while fired heaters must deliver the duty required to maintain process temperatures. Restrictions in associated selective catalytic reduction (SCR) systems can also limit heater or reformer operation, reducing the capacity available to downstream units.

As equipment deteriorates, these constraints can become more evident. Convection section fouling reduces heat recovery, tube oxidation impedes heat transfer, refractory damage creates localized hot spots, and SCR deposits increase resistance to flue-gas flow. The consequences can include higher fuel consumption, reduced operating flexibility, and production derates.

Targeted interventions can recover some of this lost performance without a major revamp. The appropriate approach depends on the limiting constraint, equipment condition, and available operating window, with some work possible online and other improvements requiring turnaround access.

Identify the Limiting Constraint

The first step is to distinguish recoverable performance losses from the plant’s underlying capacity limits. A fouled convection section, a tube-temperature limit, and excessive SCR pressure drop may require different interventions, even when each contributes to the same production restriction.

Engineers assess these relationships by comparing operating data with design conditions and a suitable historical baseline. Elevated stack temperature, particularly alongside reduced process preheat, can indicate impaired convection section heat recovery. Higher fuel consumption at comparable duty can reveal declining thermal efficiency, while tube-temperature measurements help identify uneven heat transfer or localized operating limits. Draft readings and SCR differential pressure help establish whether flue-gas resistance is contributing to a restriction.

These indicators must be interpreted together, accounting for changes in feed, throughput and operating conditions. The evaluation should quantify recoverable performance and determine whether it would translate into usable capacity. Recovering heater duty, for example, may support additional production only if hydrogen supply and downstream equipment can accommodate it.

 

 

Recover Crude Heater Performance

Crude heater performance should also form part of the assessment. Crude-heater duty influences the feed-processing capacity available upstream of hydrotreating and hydrocracking. Convection fouling and limited radiant heat transfer can restrict the duty available for crude distillation, creating an upstream constraint on refinery throughput. Recovering this duty may provide additional feed-processing flexibility, subject to downstream capacity.

At one refinery, a combined six-day turnaround scope used robotic cleaning across four convection banks and high-emissivity coating on the radiant section refractory floor, walls and roof. Post-project evaluation reported a 1.8-percentage-point increase in total fuel efficiency and identified potential for up to 4% additional crude throughput without exceeding the bridgewall-temperature limit.

 


Recover Convection Section Heat Transfer

Deposits on convection section tubes and fins create an insulating barrier that reduces heat recovery from flue gases. More heat leaves through the stack, while less reaches process streams, combustion air or steam-generating circuits, depending on heater configuration. Operators may need additional firing to maintain duty, potentially increasing fuel consumption and placing greater thermal demand on the radiant section.

Where technically suitable, online convection cleaning can recover heat transfer before the next turnaround. Engineered lances deliver cleaning media through existing or purpose-created access points while the heater remains operational. In one reported CCR platforming heater application, online cleaning reduced stack temperature by 41°C / 74°F and increased process duty by 25%.

During a turnaround, robotic cleaning can provide access deep between convection tube rows to remove deposits from otherwise difficult-to-reach surfaces. After convection section cleaning. At a hydrogen unit, offline robotic cleaning addressed convection section fouling following an earlier application of high-emissivity coating to the radiant-section refractory. The published case reports a $24.6 USD per metric ton reduction in hydrogen production costs following cleaning, distinguishing this result from the benefits of the earlier coating application.

Selecting the approach requires assessing deposit characteristics, tube arrangement, access, and operating conditions. The evaluation should establish the achievable cleaning coverage, suitable method, and expected effect on heat recovery, while accounting for equipment condition and the available maintenance window.

Address Heater Defects During Operation

Heater deterioration can restrict operation even when sufficient firing capacity remains available. Damaged refractory can expose the shell to excessive temperatures, while oxidation scale on radiant tubes impedes heat transfer. Displaced tubes can create concerns over support, clearance, and localized heating. Depending on their severity, these defects may require operating restrictions or repairs before the next planned outage.

Online inspection helps establish the location and extent of damage and whether intervention during operation is appropriate. Internal visual inspection, supported by external thermal imaging and operating data, informs the repair scope, access requirements, and execution method.

Where conditions permit, targeted hot refractory repair can restore insulation in damaged areas. Online tube descaling can remove external oxidation scale to improve heat transfer, while tube stabilization can secure displaced tubes in their existing position. Stabilization does not return a tube to its original alignment; its suitability depends on the assessed condition.

At a refinery processing approximately 173,000 barrels per day, refractory failure created a risk of an unplanned heater shutdown. Hot refractory repairs were completed over nine days without interrupting production, reducing the external shell temperature from 416°C / 780°F to 54°C / 130°F.

Such interventions can help maintain operating capability until a planned outage, when inspection findings can inform permanent repair or replacement requirements.

Improve Radiant Efficiency at Turnaround

A planned turnaround provides access to address radiant section limitations that cannot be fully resolved during operation. Radiant heat transfer depends partly on refractory emissivity (the ability of the surface to emit thermal radiation) and the condition of process tubes. Low-emissivity refractory transfers less energy by radiation, while oxidation scale on tube surfaces creates resistance to heat transfer into the process.

High-emissivity ceramic coatings applied to refractory surfaces can improve radiant heat transfer to the process tubes. On ceramic fiber linings, the coating can also encapsulate fibers, reducing deterioration and the migration of debris into downstream convection sections or SCR systems. The treatment is selected according to the refractory substrate, operating environment and identified performance limitation.

At one refinery, a high-emissivity ceramic coating was applied to the radiant section refractory of a hydrogen-unit steam methane reformer during a planned maintenance window. The treatment addressed ceramic fiber deterioration and associated convection section fouling while improving radiant heat transfer. Reported fuel savings were 8.8% after three months and 8.9% after 12 months, demonstrating that the benefit persisted beyond the initial operating period.

The operating objective should be established before application. At constant output, improved heat transfer can reduce fuel demand. Where firing capacity, tube temperatures, hydrogen-system capacity, and downstream equipment permit, additional absorbed duty may instead support increased production.

Reduce SCR Pressure Drop

Deposits on SCR catalyst faces or protective screens restrict flue-gas flow and increase differential pressure. As resistance rises, available draft can fall below what’s needed to sustain the required firing rate, derating the associated heater or reformer. In a hydrogen plant, this restriction can limit the production capacity available to support downstream processing.

Online inspection helps locate deposits, assess access, and determine whether hot vacuum cleaning is suitable. Where operating conditions permit, vacuum lances remove accumulated material through existing or purpose-created access ports while the equipment remains operational.

In one SMR application, increased SCR pressure drop contributed to reduced production and the risk of an emergency shutdown. Following online inspection, hot vacuum cleaning was completed without interrupting production. Pressure drop returned to within 5% of design, with reported payback in less than one month. The case also reported improved draft, increased process preheat and steam production, and lower stack temperature.

Deposit removal provides immediate relief, but recurring fouling requires assessment of its source. Depending on the findings, longer-term measures may include refractory encapsulation, suitable particle screens, or changes to deposit-management practices.

Match the Intervention to the Constraint

Intervention priorities should reflect the restriction’s severity, the recoverable benefit, and the available maintenance window. Online cleaning or repair may address an immediate operating limitation, while turnaround access enables more extensive cleaning and surface treatment.

The case studies demonstrate measurable benefits in recovered duty, fuel consumption, and continued operation. Whether those improvements support additional diesel production depends on hydrogen availability, process limits, and downstream capacity. Evaluating these relationships before selecting an intervention provides a clearer basis for investment and maintenance planning.

Ready to Recover Performance Across Your Diesel Production Chain?

A thermal efficiency evaluation can assess potential fuel savings, duty recovery, and emissions reductions, and evaluate any throughput opportunity against the plant’s wider operating constraints.

 

Contact us

Watch: Removing Fouling and Increasing SCR Efficiency